Search This Blog

Tuesday 12 July 2011

19. We Have Windows!

A variety contractors of have been very busy on our house this week.  The electrical wiring is done, the plumbers have put some strange fittings on some of the taps and even the aircon controller has been wired in.

The gang in charge of rendering the outside was hard at work on Sunday (hope they got overtime!) and so now this is almost done as well. 
Apparently we will have to wait until the weather warms up before the texturecoat can be applied, evidently it needs to be over 16 degrees with no dew. 
This being Perth, shouldn't pose too big a problem!


The ceilings are in and today (12/7/11) the boys were hard at work on the cornices. 
We have chosen the feature cornice "Sydney" and it looks lovely.  Well we think so anyway :) 
Another day or two and this will be finished and the plastering can begin.


The kitchen with bulkhead over the island bench.


The lounge, can't wait for the fireplace to be finished!


The entrance ceiling, with Dad looking on.
Things are all starting to fall into place with just the driveway and pool surrounds to be organised now.

We have windows with glass!!  Yay!




The stacker on the alfresco..hmmm this is not quite how it should look...the movable panes should all go to the right..will check this out!

The bulkhead over the kitchen bench..what a difference a day makes eh?  All plastered today.

The laundry door and window to "Craig's toilet". 
 Lock up just a fortnight away now :)












No comments:

Post a Comment