Monday, 27 June 2011

18. Let it rain!

Well the weather man is forecasting a very wet week but thankfully our roof and gutters are in place which means the wet shouldn't hold things up at all. 
We certainly need the rain that is for sure.
Last Friday, Perth experienced some pretty wild weather and this was the first test for our new roof, everything was great and now the floor has basically dried out.



Today (27/6/11) work began on the beading or whatever you call the metal edge strips of the walls and windows.

Craig spent time on the weekend sweeping inside only for us to to find a big sandpile in the family room, ready for work tomorrow.  I guess this means the guys doing the render can stay dry inside while they work and not have to trudge utside into the rain.  Good thinking really!


Those are not cobwebs hanging down but wires for our lights!



The ensuite, one of the things I am looking forward to most about the new house is having a bath!



Saturday, 4 June 2011

17. The Roof Is Almost Done!

Well the end of May arrived and so did the wood for our roof and the rain! 
For a couple of days the wood sat there getting drenched until the crane came in to lift the enormous metal griders/trusses...whatever they are called..into place.


Undeterred by the wet, the roof carpenters have worked through the showers.




The ceiling in the alfresco features a cofferred recess..the huge girders/trusses make up the frame for this.
As this is right at the back of the house, apparently it was touch and go if the crane would be able to reach this far. 
Glad we weren't there to see that!


The outline of the roof is visible now and the verandah posts (temporary and crooked at this stage) are in.
After agonising for weeks over the fascia colour we are pleased with our selection- Loft.



The wet weather has been great for the gardens but has left big puddles inside, so we decided to try and sweep some of the water out so hopefully the pad can dry out a bit before the actual Colorbond goes on.






Expecting the roof to be finished by the 17th June.


Saturday, 14 May 2011

16. Brickwork Almost Done!

Our house is progressing nicely and everyday there is more to see. 
We have had a few minor things that needed to be addressed like the fireplace and a couple of doors but Dino and John have been fantastic (and very patient with me) so this has all been sorted. 
 I am sure that they will be very happy when we reach lock up stage and they can keep me out.

There is still so much to do and we have been running around trying to get quotes for flooring, airconditioning, driveways etc ..as well as finalise our colour selections. (what a dilemma...what to choose??) 

 The school holidays were a great break for us but with so many public holidays because of Easter and ANZAC Day it meant that the opportunity to browse, shop and get quotes was pretty limited. 
 I do like it when we get the school vacation AND the public holidays.

The parapet wall to the end of the garage has been done, it looks great and now affords our neighbours some privacy at last.  Finally our block is totally fenced. 
Once our driveway has been done we will then install the rest of the colorbond that is stacked up on our patio at the rental.


The front door, can't wait to see the verandah complete the picture! 



Looking down the hallway  towards the front door and into the garage.


Craig cleaning the pool, again.  We are trying to keep it clean and mozzie free so we don't kill the neighbours with Ross River Virus.
The mudlarks enjoy the pool at least!


Looking across the pool into the alfresco.  The huge lintels were lifted in by crane last week. 
Having a "roof line" gives this area some dimension.


Another shot across the pool.


Looking out from the family room, sorry about the mess!


On Friday the internal collumns went into the garage and more lintels were lifted into place. 
Wish we had of been there to see that!


The front..again...I am loving this elevation!


Well that should do it for now...next update will be when the roof goes on, which will hopefully be before the wet weather arrives.
 We are getting excited now and have a potential handover date of September.
Start potting plants please!

Friday, 29 April 2011

15. The Walls are Taking Shape


The Easter break has meant things slowed down for a week or so on site, but this also gave us a chance to get a few things done too.


First up, Dad and Craig installed boards under the colourbond fence. 
This should stop plants, pets, weeds etc from coming through from the neighbour's side.
The garden bed was then topped up with ten bags of sheep manure..ready for planting!




Our next job was to paint the concrete wall surrounding the front house. 
Two coats of  "Terrace" and it looks good. 
We will probably have to do another coat later, closer to moving in but at least most of the hard work has been done now...and it didn't matter if we dripped a bit.
 (I am a notoriously messy painter !)


The front door frame is in and the aluminium sidelights replaced by the wooden frames.
All the windows on the front verandah are in so the front of the house has some shape now.



Our bedroom still needs some more walls but the WIR is done. 
Can't wait for some more internal walls so we can get a better idea of room sizes, especially the laundry and pantry.


Looking into the loungeroom from the entrance, they have started on the fireplace too.

Well, hopefully the weather holds during the day so Fred and crew can finish the brickwork this week.  Looking forward to seeing the garage unfold next!

Monday, 11 April 2011

14. The Walls Are Up!

Things are happening really quickly on site now.
Two weeks in and the external walls are about 3/4 along and now Fred and crew have started on the internals.
Our house is beginning to take shape and we can at last start to picture ourselves living there. 
It is surprising how much we miss the area after living in the same street for over 10 years.


Not quite ready to welcome visitors at the front door.

The fences are almost done as well...if only they would take the rubbish!




Jake's bedroom has three walls!


I am loving the size of that linen cupboard!


Niki in her bedroom...the room with the view! 
She is going to kill me for this pic..oh well!


The gang, unfortunately we haven't had a chance to pop the champagne yet as we have been waiting for the fences..and some privacy!

Tuesday, 29 March 2011

13. We have Walls..well one anyway!

The bricklayers started on site yesterday (28/3/11) and already we have a laundry wall.




But alas...still no fences!!!!!!!!!!!!!!!!!!!!!!!

More walls are popping up..this is getting exciting!

The loungeroom windows.


From the spare room.


Front door


....and the most exciting update is that the fences are finally going in!
(1/4/11..hope it isn't an April Fool's Day joke!!!)
Hooray!



Tuesday, 15 March 2011

12. The Bricks Have Arrived!

Well things are progressing well on site, actually some things are progressing better than others to be honest.

The bricks arrived last week,


 The window frames appeared today, 


and our stacker is there too!


If only our fencing contractor could get his act together!   He is now in Port Hedland apparently!


Sunday, 27 February 2011

11. Retaining Walls Done

Well our block is starting to take on the appearance of an actual house site now rather than the battlefield that it looked like after the HUGE soaks wells had been dug in. 


Damian has finished the retaining walls at the back on all three sides and has done a great job.


Craig backfilling the gardenbox.. a toasty 38 degree today!


One thing about having the fences down, apart from the lack of privacy...is that you get to know your neighbours. 
We are very lucky with our right boundary...the lovely Ivy had some beautiful fruit trees and has given us some delicious mangoes, she has even offerred us some plants from her garden too!




Brett and his crew should be on site tomorrow to finish off the fences (not holding our breath..he has meant to have been on site for weeks now) and then we can relax for a little while.
Well seems I spoke too soon..no show today 28/2/11..ugh!
Still no show 2/3/11 and now he is telling me it will be another 10 days...ugh! 
What do we do?  Any ideas?
Now 15/3/11 and our back and side fences are down.  This is beyond a joke.  Anyone want to know which fencing contractor NOT to use?  Message me.